2 programs scheduled on one day

paul hewitt
Actualizado 2021-12-24 05:21:45 UTC
Tema: Solución de problemas

Hi


I added an afternoon program after the morning one had run to run daily as very hot over next few days. After setting it up I went into schedule to make sure it was there and all that appears on the day is the morning schedule with a yellow triangle with exclamation mark instead of the usual tick to say it was done. I did see it running the morning schedule.


Why doesn't the afternoon schedule show up as well as the morning one?


Paul

Ver: 1907    Seguir: 0   

1 Respuesta    Haga clic en la respuesta para ver la respuesta completa y los comentarios.


Wency Pan
Actualizado 2021-12-24 08:03:55 UTC

Hi Paul,


Our R&D has fixed this issue and it should work now. For the exclamation mark, when Sprite finishes running a watering schedule, it will send a confirmation to the cloud server. In this way, the could server knows whether the schedules are correctly executed or not.

The exclamation mark means the cloud server did not receive the confirmation from the device. There are two possible causes:

1. the device is not powered up when it was supposed to be powered up to run that schedule. Therefore, the corresponding zone is not watered (what is why we use the exclamation to alert users)

2. the schedule run fine but it was during a temporary network outage or exception so that the confirmation cannot be delivered to the server. Wireless connection can be unstable for a short peroid time so it is not uncommon to have a glitch in the communication.

In your case, if the schedules afterwards are all correctly run, it could just be a temporary network issue. But if that happens a lot please check the WiFi signal strength. If you use a WiFi extender, please make sure it is connected to the main router stably.

Thanks,

Wency

Netro Support